ILLINOIS POLLUTION CONTROL
    BOARD
    February
    11, 1976
    E.
    .1.
    DU PONT DE NEMOURS AND
    )
    COMPANY,
    Petitioner,
    v.
    )
    PCB 76-30
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER
    OF
    TIlE BOARD
    (By Dr. Satchell):
    Petition filed February
    2, 1976 is inadequate in that:
    (1)
    no assurance is given that by granting instant petition
    violation of other regulations and/or rules would not
    ensue to the detriment of the environment; specifically,
    Rules
    203(f),
    402,
    and 401(c)
    of Chapter
    3: Water Pollution
    of the Pollution Control Board.
    (2) pursuant to the Procedural Rules of the Board, statements
    covering a time schedule
    Rule
    401(vii),(viii)
    for com-
    pliance are required.
    While the arguments for use of ion exchange methods for
    pollution abatement and non-use of the regenerating solution
    may be reasonable,
    it is not clear why the method
    of regenera-
    ti.on used in fertilizer manufacture is also proposed here.
    Petitioner shall amend the Petition within 45 days from the
    date of this Order to supply the requested information.
    Failure to
    timely file the Amended Petition shall make this cause liable
    to dismissal for inadequacy.
    The 90—day decision period set
    by statute shall run from the date of filing the Amended Petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the //~“ day
    of February, 1976 by a vote of
    4/..e~
    Illinois Pollution
    ontrol Board
    20—75

    Back to top