ILLINOIS POLLUTION CONTROL BOARD
January
 8, 1987
VILLAGE OF PAWNEE,
 )
Petitioner,
)
V.
 )
 PCB 86—73
ILLINOIS ENVIRONMENTAL
 )
PROTECTION AGENCY,
 )
)
Respondent.
ORDER OF THE BOARD
 (by 3.
 Theodore Meyer):
On December 31,
 1986 the Village of Pawnee
 (Village) filed a
motion for modification
 of the Board’s Order
 of October
 9,
 1986
granting the Village variance.
 The variance was granted
 for the
period March
 1,
 1987 through July 31,
 1987 to allow exceedances
of the BOD5 and TSS effluent limitations
 for approximately 19
days while improvements are made
 to
 a lagoon.
 The Village has
subsequently determined that replacement,
 rather than repairs, of
certain aspects of its system
 is warranted which requires
modifying the work schedule
 to accommodate
 a completion date of
September
 30, 1987,
 and allowing discharges at exceedance levels
for
 60 rather than
 19 days.
 Petitioner represents that the
Illinois Environmental Protection Agency does not object
 to the
grant of relief as requested
 in the motion.
Accordingly, the Village’s motion for modification
 is hereby
granted and Attachment A to the Board’s October
 9, 1986 Order
 is
hereby replaced
 by Exhibit A to the Roth Affidavit contained
 in
the December
 31, 1986 motion.
IT
 IS
 SO ORDERED.
I,
 Dorothy
 M.
 Gunn, Clerk of the Illinois Pollution Control
Board, hereby cert
 y that the above Order was adopted on
the
 ~?4
 day of
_________________,
 1987, by a vote of
________
Illino
 Control Board
74-383
PLAN OF OPERATION DURING CONSTRUCTION
OF AERATED LAGOON IMPROVEMENTS
REVISED DECEMBER, 1986
ESTIMATED
 ESTIMATED
DATE OF ACTIVITY
 PLANT
 EFFLUENT STENCTH
CONSTRUCTION SEQUENCE
 START
 COMPLETE
 DISCHARGE
 BOO
 TSS
1.
 Pump or siphon cells
 2 & 3 to a 6’ water
 March 1
 May 1
 0.827 MCD
 30
 37
depth (normal depth
 is 11’) and pump tansfer
from Cell
 ill to Cell
 #2
 to empty that cell.
2.
 Construct a decant pond
 to the east of the
 May 1
 May 31
 0.359 MCD
 30
 37
existing lagoons.
3.
 Install a 12” line from the proposed transfer
 May 1
 May 31
 0.359 MCD
 30
 37
structure between cells 1 and 2,
 to the
chlorine structure.
 At the same
 time,
install new air line on berm between
cells 1 and
 2.
4.
 Dredge the sludge from
 the
 lagoons,
 June
 1
 June 15
 0
 0
 0
discharging
 to the newly constructed
 June 15
 June 30
 0.359 MCD
pond and decanting back
to
 the lagoons.
Dredge cells 2 and 3 before cell
 1.
 Let
raw sewage accumulate
 in cell 1 from
June 1
—
 June 15 and transfer at influent
rate June
 15
 —
 June 30.
5.
 Continue to lower cells
 2 and 3, by
 June
 15
 June
 30
 0.864 MGD
 40
 50
discharge into
 the stream,
 allowing raw
sewage pumpage
 to accumulate
 in Pond No. 1
from June 1
—
 June 15 and transfer from
cell 1 to cell
 2 at
 influent rate
June15
—
 June 30.
PLAN
 OF OPERATION DURING CONSTRUCTION
 OF AERATED LAGOON IMPROVEMENTS
REVISED DECEMBER,
 1986
ESTIMATED
 ESTIMATED
DATE OF ACTIVITY
 PLANT
 EFFLUENT STENGTH
CONSTRUCTION SEQUENCE
 START
 COMPLETE
 DISCHARGE
 BOD
 TSS
6.
 Install air lines and static tube aerators
 July
 1
 July 30
 0
 0
 0
in cell 2, construct the transfer structure
between cells
 2 & 3,
 construct the rock
filter in cell 3, place riprap in cell
 3,
construct outlet structure
 In cell 3 and
install new outlet pipe.
 Allow raw sewage
to accumulate
 in cell
 1.
~
 7.
 Let water levels in
 the
 ponds equalize, and
 Aug.
 1
 Aug. 10
 0
 0
 0
check out air system in cell 2 while this
is taking place.
8.
 Transfer contents of cell 1 to cell 2 by
 Aug.
 10
 Aug. 25
 1.04* MCD
 40
 50
pumping, and discharge raw sewage to cell
2 by newly installed line.
9.
 Install air lines and static tube aerators
 Aug.
 25
 Sept.
 25
 0.300* MCD
 40
 50
in cell
 1.
10. Test air system
 In
 cell 1 by transferring
 Sept.
 25
 Sept.
 30
 0
 0
 0
part of contents of cell 2 to cell
 1.
11. Resume normal operation flowing through
 Sept.
 30
 0.30
—
 0.359
 30
 37
cells
 1,
 2 and 3 in series.
 MCD
*
 Raw sewage pumpage should be less (assumed to be 0.300 MCD) than 0.359 used for earlier part of construction.
CERTIFICATE OF SERVICE
I, Dawn N. Butler,
 bereby certify that
 I caused a copy of
the Motion for Modification of Pollution Control Board Order
Dated October 9, 1986 to be served upon:
Mr. William Hutton
Illinois Environmental Protection Agency
2200 Churchill Road
Springfield,
 Illinois
 62706
by mailing
 to him a true copy
 in an envelope duly addressed
 to
him,
 bearing
 first class postage and depositing
 same in the U.S.
Mail in Springfield,
 Illinois,
 this 30th day of December,
 1986e
~
 ~
74-386