ILLINOIS POLLUTION CONTROL BOARD
March 16, 2006
PEOPLE OF THE STATE OF ILLINOIS,
Complainant,
v.
4832 S. VINCENNES, L.P., an Illinois
limited partnership, and BATTEAST
CONSTRUCTION COMPANY, an Indiana
corporation,
Respondents.
)
)
)
)
)
)
)
)
)
)
)
)
PCB 04-7
(Enforcement - Air)
INTERIM OPINION AND ORDER OF THE BOARD (by T.E. Johnson):
On July 14, 2003, the Office of the Attorney General, on behalf of the People of the State
of Illinois (People), filed a complaint against 4832 S. Vincennes, L.P. (Vincennes) and Batteast
Construction Company of Illinois, Inc. The People alleged that respondents caused or allowed
air pollution and violated various asbestos-related provisions in the renovation of a Chicago
apartment building.
Today the Board decides a motion for summary judgment filed by the People against
Vincennes on October 17, 2005. For the reasons discussed below, the Board denies the People’s
motion for summary judgment and directs the parties to proceed to hearing.
In addition, the Board accepts a stipulation and proposed settlement between the People
and Batteast Construction Company (Batteast) filed on December 30, 2005. Under the terms of
that settlement, Batteast admits the alleged violations and agrees to pay a civil penalty of $1,500.
This interim opinion and order first reviews the procedural history of this case and
addresses a preliminary motion. Next, the opinion and order considers the People’s motion for
summary judgment. Finally, the Board accepts the People’s settlement with Batteast before
issuing its order.
PROCEDURAL HISTORY
On July 14, 2003, the People filed a complaint against Vincennes and Batteast
Construction Company of Illinois, Inc. On July 24, 2003, the Board accepted the complaint for
hearing. On September 8, 2003, Vincennes answered the complaint.
On November 6, 2003, the Board granted the motion of Batteast Construction Company
of Illinois, Inc. to be dismissed. In the same order, the Board also granted the People’s motion
for leave to file the first-amended complaint and accepted the first amended complaint for
2
hearing. The first-amended complaint substitutes Batteast for Batteast Construction Company of
Illinois, Inc. but is otherwise materially the same as the original complaint accepted for hearing
on July 24, 2003.
On October 17, 2005, the People filed a motion for summary judgment (Mot. SJ) against
Vincennes. With leave of the hearing officer, Vincennes, on November 7, 2005, filed its
memorandum in opposition to complainant’s motion for summary judgment (Resp.). On
November 21, 2005, the People filed a motion for leave to file a reply to respondent’s
memorandum in opposition to complainant’s motion for summary judgment (Mot. Leave)
accompanied by its reply (Reply). In the motion for leave to file, the People claim they would be
materially prejudiced if not allowed to file a reply. Mot. Leave at 2. Vincennes has not objected
to the motion for leave to file. The Board may allow a reply to prevent material prejudice.
See
35 Ill. Adm. Code 101.500(e). The Board finds that material prejudice would result if the
People’s reply is not accepted. Accordingly, the Board grants the motion for leave to file, and
accepts the reply.
On December 30, 2005, the People filed a stipulation and proposal for settlement as to
Batteast, accompanied by a motion to request relief from hearing. The Board published notice of
this proposed settlement in the January 5, 2006
Chicago Sun-Times
and did not receive a request
for a hearing.
THE AMENDED COMPLAINT’S ALLEGATIONS
Count I
The October 2003 amended complaint alleges in count I that Vincennes is and has been
at all relevant times the owner of a four-story residential apartment building containing 67 units
at 4832 South Vincennes Avenue, Chicago, Cook County (site). Am. Comp. at 2. The amended
complaint names Batteast as the operator and manager of the site renovation.
Id
. The amended
complaint further alleges that the respondents began renovation of the site on or about August of
2001.
Id
.
The People allege that Batteast, in the course of renovating the site on or about December
2001, discovered suspect asbestos-containing material (ACM) in the basement area while
replacing first-floor floors. Am. Comp. at 2. The People claim that, after making this discovery,
“Batteast contacted two asbestos contractors to bid on the removal of 3750 linear feet of ACM
thermal system insulation, and 480 square feet of ACM surface materials in the boiler.”
Id
. The
People argue that “[a]fter the discovery of the suspect ACM, Respondents continued to employ
workers to complete the renovation.” Am. Comp. at 3.
The People further allege that, on January 31, 2002, the Illinois Environmental Protection
Agency (Agency) inspected the building on the site. Am. Comp. at 3. The People state that, “on
information and belief, no asbestos contractors had been hired by the Respondents as of
January 31, 2002.”
Id
.
3
The complaint states that an asbestos abatement and remediation plan took place between
February 14, 2002 and February 19, 2002. Am. Comp. at 4. The People further allege that,
under the plan, respondents removed 2400 linear feet of disturbed ACM and 6000 square feet of
ACM tiles.
Id
.
The People allege in count I that, from December of 2001 to at least February 5, 2002,
“respondents caused or allowed dry friable asbestos containing material to enter into the
environment.” Am. Comp. at 5. The People further allege that Vincennes, as the owner of the
site, “caused, threatened, or allowed the discharge or emission of asbestos into the environment
so as to cause or tend to cause air pollution in that dry, friable asbestos fibers were released into
the atmosphere during the renovation activities.” Am. Comp. at 5. The People further allege
that Vincennes caused or allowed air pollution in Illinois “[b]y allowing dry friable asbestos
containing materials to remain in a friable state, exposed to the environment.” Am. Comp. at 6,
citing 415 ILCS 5/9(a) (2004); 35 Ill. Adm. Code 201.141.
Count II
The amended complaint alleges that Vincennes, as owner of a “renovation,” violated the
Act and federal regulations by failing to conduct a thorough inspection of the facility for the
presence and location of asbestos before commencing renovation activities, by failing to remove
all regulated asbestos-containing material (RACM) from a facility being renovated before an
activity began that would break up, dislodge, or similarly disturb the material or preclude access
for subsequent removal, and by failing to adequately wet all RACM and ensure that it remained
wet until collected and contained or treated in preparation for disposal Am. Comp. at 12-13.
STATUTORY AND REGULATORY PROVISIONS
Section 9.1(d)(1) of the Illinois Environmental Protection Act (Act) provides that “[n]o
person shall violate any provisions of Section 111, 112, 165, or 173 of the Clean Air Act, as now
or hereafter amended, or federal regulations adopted pursuant thereto . . . .” 415 ILCS
5/9.1(d)(1) (2004).
The Code of Federal Regulations provides definitions including the following at 40
C.F.R. 61.141:
Asbestos means the asbestiform varieties of serpentinite (chrysotile), riebeckite
(crocidolite), cummingtonite-grunerite, anthrophyllite and actinolite-tremolite.
Category II nonfriable ACM means any material, excluding Category I nonfriable
ACM, containing more than 1 percent asbestos as determined using the methods
specified in appendix A, subpart F, 40 C.F.R. part 763, section 1, Polarized Light
Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder
by hand pressure.
4
Demolition means the wrecking or taking out of any load-supporting structural
member of a facility together with any related handling operations or the
intentional burning of any facility.
Facility means any institutional, commercial, public, industrial, or residential
structure, installation, or building (including any structure, installation, or
building containing condominiums or individual dwelling units operated as a
residential cooperative, but excluding residential buildings having four or fewer
dwelling unites); any ship; and any active or inactive waste disposal site. For
purposes of this definition, any building, structure, or installation that contains a
loft used as a dwelling is not considered a residential structure, installation, or
building. Any structure, installation, or building that was previously subject to
this subpart is not excluded, regardless of its current use or function.
Friable asbestos material means any material containing more than 1 percent
asbestos as determined using the method specified in appendix E, subpart E, 40
C.F.R. Part 763, Section 1, Polarized Light Microscopy, that, when dry, can be
crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos
content is less than 10 percent as determined by a method other than point
counting by polarized light microscopy (PLM), verify the asbestos content by
point counting using PLM.
Owner or operator of a demolition or renovation activity means any person who
owns, leases, operates, controls, or supervises the facility being demolished or
renovated or any person who owns, leases, operates, controls, or supervises the
demolition or renovation operation, or both.
Regulated asbestos-containing material (RACM) means (a) Friable asbestos
material, (b) Category 1 nonfriable ACM that has become friable, (c) Category 1
nonfriable ACM that will be or has been subjected to sanding, grinding, cutting,
or abrading, or (d) Category II nonfriable ACM that has a high probability of
becoming or has become crumbled, pulverized, or reduced to powder by the
forces expected to act on the material in the course of demolition or renovation
operations regulated by this subpart.
Remove means to take out RACM or facility components that contain or are
covered with RACM from any facility.
Renovation means altering a facility or one or more facility components in any
way, including the stripping or removal of RACM from a facility component.
Operations in which load-supporting structural members are wrecked or taken out
are demolitions. 40 C.F.R. 61.141
The Code of Federal Regulations provides at 40 C.F.R. 61.145:
5
(a) Applicability. To determine which requirements of paragraph (a), (b), and
(c) of this section apply to the owner or operator of a demolition or
renovation activity and prior to the commencement of the demolition or
renovation, thoroughly inspect the affected facility or part of the facility
where the demolition or renovation operation will occur for the presence
of asbestos, including Category I and Category II nonfriable ACM. The
requirements of paragraph (b) and (c) of this section apply to each owner
or operator of a demolition or renovation activity, including the removal of
RACM as follows:
(1) In a Facility being demolished, all the requirements of paragraphs
(b) and (c) of this section apply, except as provided in paragraph
(a)(3) of this section, if the combined amount of RACM is:
(i) At least 80 linear meters (260 linear feet) on pipes or at
least 15 square meters (160 square feet) on other Facility
components, or
(ii) At least 1 cubic meter (35 cubic feet) off facility
components where the length or area could not be measured
previously.
* * *
(c) Procedures for asbestos emission control. Each owner or operator of a
demolition or renovation activity to whom this paragraph applies,
according to paragraph (a) of this section, shall comply with the following
procedures:
(1) Remove all RACM from a facility being demolished or renovated
before any activity begins that would break up, dislodge, or
similarly disturb the material or preclude access to the material for
subsequent removal.
* * *
(6) For all RACM, including material that has been removed or
stripped:
(i) Adequately wet the material and ensure that it remains wet
until collected and contained or treated in preparation for
disposal in accordance with § 61.150.
Section 101.516 of the Board’s procedural rules provides that “if the record, including
pleadings, depositions, and admissions on file, together with any affidavits, show that there is no
genuine issue if material fact, and the moving party is entitled to judgment as a matter of law, the
Board will enter summary judgment.” 35 Ill. Adm. Code 101.516.
6
PEOPLE’S MOTION FOR SUMMARY JUDGMENT
Count I
The People assert that t]he complaint, answer and discovery pleadings filed in this cause,
together with the depositions, documents and affidavits supporting this motion, establish all
material facts necessary to prove liability against Vincennes on the two counts of the first
amended complaint. Mot. SJ at 2.
The People argue they have shown that, at all times relevant to this complaint, Vincennes
has been and remains the owner of the site. Mot. SJ at 4, citing Ans. at 1, ¶ 3 (admitting
allegation). The People further argue they have shown that, at all relevant times, Batteast was
the operator and manager of the renovation of the site. Mot. SJ at 4, citing Ans. at 1, ¶ 4
(admitting allegation). The People claim Vincennes has admitted that the respondents began
renovation of the site on or around August of 2001. Mot. SJ at 4, ¶ 5 (admitting allegation).
The People claim that after discovering ACM in the basement of the site, Batteast
contacted two asbestos contractors to bid on the removal of 3750 linear feet of ACM thermal
system insulation, and 480 square feet of ACM surface material on the boiler. Mot. SJ at 5,
citing Ans. at 1, ¶ 7 (admitting allegation). The People further claim they have shown that, after
discovery of the suspect ACM, respondents continued to employ workers on the site to complete
the renovation. Mot. SJ at 5.
The People contend they have shown that, on January 31, 2002, Vincennes refused to
stop work and that Batteast continued to work on the premises. Mot. SJ at 6, citing Mot. SJ,
Exh. A (Zappa affidavit); Mot. SJ, Exh. C (Miller deposition); Resp. Req. Admit at 2, ¶ 4. The
People further claim they have shown that, on January 31, 2002, there were several workers
performing work in and around the first floor of the site. Mot. SJ at 6, citing Mot. SJ, Exh. A
(Zappa affidavit); Resp. Req. Admit at 2 (¶ 8) (admitting allegation). The People argue they
have demonstrated that those workers were neither wearing personal protective equipment nor
using emission control procedures. Mot. SJ at 6, citing Mot. SJ, Exh. A (Zappa affidavit); Resp.
Req. Admit at 2 (¶ 8) (admitting allegation). The People further argue that have demonstrated
that most of the windows and doors at the site were open to the atmosphere. Mot. SJ at 6, citing
Mot. SJ, Exh. A (Zappa affidavit).
The People argue they have shown that the City of Chicago, which was providing some
of the funding for the renovation of the site, was contacted after the inspection of the site on
January 31, 2002. Mot. SJ at 6, citing Mot. SJ, Exh. A. The People further argue they have
shown that, on February 5, 2002, the city issued a stop work order and that renovation work at
the site stopped. Mot. SJ at 6, citing Ans. at 2 (¶ 15) (admitting allegation).
The People contend that they have demonstrated that an approved asbestos abatement and
remediation plan began at the site on February 14, 2002, and was completed on February 19,
2002. Mot. SJ at 6, citing Ans. at 2 (¶ 16) (admitting allegation). The People also claim they
have demonstrated that execution of the plan resulted in the removal of 2400 linear feet of
7
disturbed ACM and 6000 square feet of ACM tiles. Mot. SJ at 6, citing Ans. at 2 (¶ 17)
(admitting allegation).
The People argue they have shown that, from December 2001 until at least February 5,
2002, Vincennes caused or allowed dry friable ACM to enter into the environment. Mot. SJ at 8,
citing Mot. SJ, Exh. A (Zappa affidavit); Mot. SJ ,Exh. B (Guidarelli-Pelletier affidavit); Mot.
SJ, Exh. C (Miller deposition at 63); Resp. Req. Admit. at 2 (¶ 8); Ans. at 2 (¶ 17). The People
further argue they have shown that, as owner of the site, Vincennes “caused, threatened, or
allowed the discharge or emission of asbestos into the environment so as to cause or tend to
cause air pollution in that dry, friable asbestos fibers were released into the atmosphere during
the renovation activities.” Mot SJ at 8, citing Mot. SJ, Exh. A (Zappa affidavit), Mot. SJ, Exh. C
(Miller deposition at 63), Resp. Req. Admit at 2 (¶ 8), Ans. at 2 (¶¶ 15, 17).
The People conclude that there exists no genuine issue as to any material fact, and the
Complainant is entitled to judgment on Count I on the pleadings, admissions on file, depositions,
and affidavits. Mot. SJ at 9. Specifically, the People argue that Vincennes allowed dry friable
asbestos to remain in a friable state, thus causing or allowing air pollution in violation of Section
9(a) of the Act and Section 201.141 of the Board’s regulations.
Id
., citing 415 ILCS 5/9(a)
(2004), 35 Ill. Adm. Code 201.141.
Count II
The People argue they have shown that Vincennes, as owner of the site, “was the ‘owner’
of the renovation activities, as that term is defined in 40 C.F.R. 61.141.” Mot. SJ at 13, citing
Ans. at 3 (¶ 31) (admitting allegation). The People further argue they have shown that
Vincennes, as owner of the renovation activity, “failed to conduct a thorough inspection of the
facility for the presence and location of asbestos before commencing renovation activities” in
violation of asbestos standards and the Section 9.1(d)(1) of the Act. Mot. SJ at 15, citing 415
ILCS 5/9.1(d)(1) (2004), 40 C.F.R. 61.145(a), Mot. SJ, Exh. A (Zappa affidavit), Mot. SJ, Exh.
C (Miller deposition at 30, 63), Ans. at 1-2 (¶¶ 5, 17).
The People further argue they have demonstrated that Vincennes “failed to remove all
RACM from a facility being renovated or demolished before an activity began that would break
up, dislodge, or similarly disturb the material or preclude access for subsequent removal” in
violation of asbestos standards and the Section 9.1(d)(1) of the Act. Mot. SJ at 15-16, citing 415
ILCS 5/9.1(d)(1) (2004), 40 C.F.R. 61.145(c)(1), Mot. SJ, Exh. A (Zappa affidavit), Mot. SJ,
Exh. C (Miller deposition at 30, 63), Ans. at 1-2 (¶¶ 5, 17).
The People further argue they have shown that Vincennes “failed to adequately wet all
RACM and ensure that it remained wet until collected and contained or treated in preparation for
disposal” in violation of asbestos standards and Section 9.1(d)(1) of the Act. Mot. SJ at 16,
citing 415 ILCS 5/9.1(d)(1) (2004), 40 C.F.R. 61.145(c)(6), Mot. SJ, Exh. A (Zappa affidavit),
Resp. Req. Admit at 2 (¶ 8). The People thus conclude that “[t]here exists no genuine issue as to
any material fact, and the Complainant is entitled to judgment on Count II on the pleadings,
admissions on file, depositions, and affidavits.” Mot. SJ at 16.
8
RESPONDENT VINCENNES’ RESPONSE
Vincennes states that the People are aware that a “Phase I environmental assessment”
performed before the beginning of the renovation did not indicate that asbestos was present
there. Resp. at 1 (citing to deposition not filed as exhibit to motion or response). Vincennes
states that Batteast never told Gregory Miller, the owner’s representative, that the environmental
consultant Hygieneering had been hired regarding asbestos at the site. Resp. at 2, citing Resp. at
2, Exh. A (acceptance of Hygieneering proposal). Vincennes further states that Hygieneering’s
correspondence went to Batteast and shows no contact with Mr. Miller. Resp. at 2, citing Mot.
SJ, Exh. B (Guidarelli-Pelletier affidavit and attachments). Vincennes further states that “[n]one
of the correspondence, contracts, invoices, tests results, etc. between Hygieneering, Inc., and
Batteast Construction Company were forwarded to, nor shared with Mr. Miller.’ Resp. at 2.
Vincennes refers to the minutes from a series of meetings apparently concerning the site and
argues that none of these minutes include Mr. Miller in attendance.
See
Resp., Exh. B. When
Mr. Miller was notified of “a
suspicion
of the presence of asbestos,” Vincennes states that it
simply deferred to the contractor to do what was necessary. Resp. at 2 (citing to deposition not
filed as exhibit to motion or response) (emphasis in original).
Vincennes refers to those minutes to claim that the basement area of the site had been
tested for asbestos on December 18, 2001, and that test results were expected within three to five
days. Resp. at 2, Exh. B. Vincennes further claims that the minutes of the January 2, 2002
meeting show that Batteast “will close down the job” as a result of positive tests for asbestos.
Resp. at 2, Exh. B. Vincennes points to the minutes of a January 16, 2002 meeting to show that
“[a]batement contractors have been requested to make proposals for asbestos abatement.”
Id
.
Vincennes also points to the minutes of a January 30, 2002 meeting to show that Batteast “will
close down all interior work.”
Id
. Vincennes further argues that none of the Construction
Meeting Minutes make reference to any work in progress. Resp. at 2.
Vincennes argues that the reference in the January 30, 2002 minutes to closing down
interior work came the day before Mr. Zappa’s inspection on behalf of the Agency. Resp. at 3;
see
Mot. SJ, Exh. A. Vincennes contends that Mr. Zappa’s inspection did not constitute notice
that the site contained suspected ACM. Resp. at 3-4. Vincennes notes Mr. Zappa’s affidavit
states that Mr. Miller refused on January 31, 2002, to stop work on the site but does not
affirmatively state that Mr. Zappa actually spoke with Mr. Miller on that date. Resp. at 3;
see
Mot. SJ, Exh. A. Vincennes claims that:
Mr. Zappa merely left his cell phone number with an employee of Batteast
Construction with no indication of his official capacity. He did not display any
credentials of his position as an Inspector for the Illinois Environmental
Protection Agency; he was not driving a vehicle with the State of Illinois insignia;
and left a mere verbal notice that the work site would have to be shut down.
Resp. at 3-4 (citing to deposition not filed as exhibit to motion or response).
Vincennes asserts that it did not have notice of the presence of ACM until “[a] written Stop
Work order was received by Mr. Miller on February 5, 2002.” Resp. at 4, Exh. C.
9
Vincennes further suggests that the People are aware “that the premises were boarded up
and secure.” Resp. at 2 (citing to deposition not filed as exhibit to motion or response).
Vincennes notes that, on the February 5, 2002 date of the city’s Stop Work order, a city inspector
received assurance that the security of the site would be maintained.” Resp. at 4, Exh. D.
In conclusion, Vincennes argues that the pleadings and exhibits “establish that genuine
issues of fact remain as to whether the Respondent failed to inspect and to follow proper
emission control procedures when asbestos was discovered.” Resp. at 4.
PEOPLE’S REPLY
The People argue that Vincennes’ response is flawed by making allegations that are not
supported by affidavits. Reply at 1. The People further argue that Vincennes has attached to its
response several documents that are not authenticated as business records or on any similar basis.
Reply at 1-2,
see
35 Ill. Adm. Code 101.626(e). Accordingly, the People claim that the Board
should disregard those assertions and documents in deciding their motion for summary
judgment. Reply at 2.
The People claim that the assertions and documents attached by Vincennes actually
support the motion for summary judgment. Reply at 2. The People note that Vincennes’ Exhibit
A was also submitted with its motion. Reply at 2; Mot. SJ, Exh. B (Hygieneering proposal).
The People argue that this document dated December 10, 2001 shows knowledge of the presence
of asbestos at the site before any Agency inspection. Reply at 2.
The People further argue that the construction meeting minutes attached by Vincennes to
its response as Exhibit B, had never been produced in the course of discovery, but nevertheless
show knowledge of the presence of asbestos before any Agency inspection. Reply at 2.
The People further note that the four sets of minutes include initials or abbreviations
showing that a number of persons or entities received copies of them, and that any of the several
persons copied could have been Gregory Miller, the owner’s representative, or some other
person representing Vincennes. Reply at 2.
The People stress that the construction meeting minutes actually show that the site would
be closed during the performance of the asbestos abatement and that the admissions of fact and
deposition statements show that workers were on the premises at least through January 31, 2002,
and that the job was not shut down until the City of Chicago issued a stop work order on
February 5, 2002. Reply at 3.
The People also rely on Vincennes’ Exhibit D to dispute the claim that the site had been
secured, stressing that the writer states that the site was “unsecured” and that this lack of security
allowed access to the site. Reply at 2; Resp., Exh. D.
Finally, the People note Vincennes had argued that the People’s affidavits had not been
prepared by an expert or experts qualified regarding the presence of asbestos. Reply at 3; Resp.
10
at 2. The People respond that “[n]o experts are necessary as the Respondent has clearly admitted
in its Answer that asbestos was on the premises.” Reply at 3.
DISCUSSION
The Board’s procedural rules provide that, “if the record, including pleadings,
depositions, and admissions on file, together with any affidavits, show that there is no genuine
issue of material fact, and the moving party is entitled to judgment as a matter of law, the Board
will enter summary judgment.” 35 Ill. Adm. Code 101.516. In ruling on a motion for summary
judgment, the Board “must consider the pleadings, depositions, and affidavits strictly against the
movant and in favor of the opposing party.” Dowd & Dowd, Ltd. V. Gleason, 181 Ill. 2d 460,
483, 693 N.E.2d 358, 270 (1998). Summary judgment “‘is a drastic means of disposing of
litigation,’ and therefore it should be granted only when the movant’s right to the relief ‘is clear
and free from doubt.’”
Id
., citing Purtill v. Hess, 111 Ill. 2d 229, 240, 489 N.E.2d 867, 871
(1986).
The Board first finds that Vincennes’ response to the motion for summary judgment lacks
a supporting affidavit or affidavits and that it includes documents that have not been
authenticated as business records or on any other grounds. The Board’s procedural rules provide
that “[a] writing or record, whether in the form of any entry in a book or otherwise made as a
memorandum or record of any act, transaction, occurrence, or event, may be admissible as
evidence of the act, transaction, occurrence, or event.” 35 Ill. Adm. Code 101.626(e)
(Admission of Business Records). However, “[to] be admissible, the writing or record will have
been made in the regular course of business, provided it was the regular course of business to
make the memorandum or record at the time of the act, transaction, occurrence, or event, or
within a reasonable time thereafter.” 35 Ill. Adm. Code 101.626(e). Vincennes did not
adequately show that exhibits A-D meet Board’s articulated standard for admission of business
records. Accordingly, the Board will not consider Vincennes’ exhibits A-D, in determining
whether to grant the Peoples’ motion. However, the Board notes that Exhibit A submitted by
Vincennes is identical to a document submitted as part of an exhibit to the People’s motion for
summary judgment and authenticated by affidavit. Mot. SJ, Exh. B (affidavit and authenticated
exhibits of Margaret Guidarelli-Pelletier). The Board thus has an independent basis on which it
may consider that exhibit, and the information contained therein is part of the record.
As previously stated, summary judgment is a drastic means of disposing of litigation, and
should only be granted if the movant’s right to the relief is free from doubt. The Board has
extensively reviewed the record and arguments before it. When considering the available record
strictly against the movant and in favor of the opposing party, the Board cannot conclude that
this case presents no genuine issue of material fact, or that the People are entitled to judgment as
a matter of law. The motion for summary judgment is therefore denied, and the Board directs
the hearing officer to proceed expeditiously to hearing on the two counts of the amended
complaint.
11
PROPOSED SETTLEMENT WITH BATTEAST
On December 30, 2005, the People and Batteast filed a stipulation and proposed
settlement, accompanied by a request for relief from the hearing requirement of Section 31(c)(1)
of the Act (415 ILCS 5/31(c)(1) (2004)). This filing is authorized by Section 31(c)(2) of the Act
(415 ILCS 5/31(c)(2) (2004)).
See
35 Ill. Adm. Code 103.300(a). The Board provided notice of
the stipulation, proposed settlement, and request for relief. The newspaper notice was published
in the
Chicago Sun-Times
on January 5, 2006. The Board did not receive any request for
hearing. The Board grants the parties’ request for relief from the hearing requirement.
See
415
ILCS 5/31(c)(2) (2004); 35 Ill. Adm. Code 103.300(b).
Section 103.302 of the Board’s procedural rules sets forth the required contents of
stipulations and proposed settlements. 35 Ill. Adm. Code 103.302. These requirements include
stipulating to facts on the nature, extent, and causes of the alleged violations and the nature of
Batteast’s operations. Section 103.302 also requires that the parties stipulate to facts called for
by Section 33(c) of the Act (415 ILCS 5/33(c) (2004)). The People and Batteast have satisfied
Section 103.302. Batteast admits the alleged violations and agrees to pay a civil penalty of
$1,500. The Board accepts the stipulation and proposed settlement.
CONCLUSION
The Board denies the People’s motion for summary judgment against Vincennes in its
entirety. The hearing officer is directed to proceed expeditiously to hearing. The Board accepts
the stipulation and proposed settlement filed on December 30, 2005, by the People and Batteast.
This interim opinion constitutes the Board’s interim findings of fact and conclusions of
law.
ORDER
1. The Board accepts and incorporates by reference the stipulation and proposed
settlement entered into by the People and Batteast.
2. Batteast must pay a civil penalty of $1,500 no later than Monday,
April 17, 2006, which is the first business day after the 30th day after the date of
this order. Batteast must pay the civil penalty by certified check or money order,
payable to Environmental Protection Trust Fund. The case number, case name,
and Batteast’s social security number or federal employer identification number
must be included on the certified check or money order.
12
3. Batteast must send the certified check or money order to:
Illinois Environmental Protection Agency
Fiscal Services Division
1021 North Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
4. Penalties unpaid by Batteast within the time prescribed will accrue interest under
Section 42(g) of the Environmental Protection Act (415 ILCS 5/42(g) (2004)) at
the rate set forth in Section 1003(a) of the Illinois Income Tax Act (35 ILCS
5/1003(a) (2004)).
5. Batteast must cease and desist from the alleged violations.
IT IS SO ORDERED.
Board Member A.S. Moore dissented.
With regard to Batteast and the Board’s acceptance of its settlement with the People,
Section 41(a) of the Environmental Protection Act provides that final Board orders may be
appealed directly to the Illinois Appellate Court within 35 days after the Board serves the order.
415 ILCS 5/41(a) (2004); see
also
35 Ill. Adm. Code 101.300(d)(2), 101.906, 102.706. Illinois
Supreme Court Rule 335 establishes filing requirements that apply when the Illinois Appellate
Court, by statute, directly reviews administrative orders. 172 Ill. 2d R. 335. The Board’s
procedural rules provide that motions for the Board to reconsider or modify its final orders may
be filed with the Board within 35 days after the order is received. 35 Ill. Adm. Code 101.520,
see also
35 Ill. Adm. Code 101.902, 102.700, 102.702.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above interim opinion and order on March 16, 2006, by a vote of 3-1.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board