ILLINOIS POLLUTION CONTROL BOARD
March
26, 1975
)
L and
fl APARTMENTS,
)
)
Petitioner,
)
)
)
v.
)
PCB 75-124
)
)
ENVIRONMENTAL PROTECTION AGENCY,
)
)
Respondent.
)
)
ORDER OF TUE BOARD
(by Mr. Dumelle)
Petition filed March
20,
1975
is inadequate
in that
the environmental effect of additional connections
to the
Toledo Waste Treatment Plant
is not given.
Petitioner shall delineate
the condition of the receiving
stream as
to conditions now present which would not meet the
water quality standards of the Board.
Petitioner shall supply the needed information within 45
days.
Failure
to timely file
the needed information shall make
the petition liable to dismissal for inadequacy.
The 90-day
decision period set by statute shall run from the date of
filing the additional
information.
IT
IS SO ORDERED.
I, Christan L. Moffett, Clerk of
the
Illinois
Pollution
Control
Board, hereby certify the above Order was adopted on the
~(I~
day of March, 1975 by a vote
of
__________________________
~
Illinois Pollution
C
ol Board
16—251