ILLINOIS POLLUTION CONTROL BOARD
October 17,
1974
IN THE MATTER OF
72
18
GRAIN HANDLING REGULATIONS ~
PCB R
-
INTERIM ORDER OF THE
BOARD
(by Dr. Odell)
On October
2,
1974,
the Illinois Environmental Protection
Agency
(Agency)
filed with the Illinois Pollution Control Board
(Board)
a Motion for Clarification and Reconsideration of the
Interim Board Order of August
8,
1974,
in the above—entitled matter.
The Agency specifically requested a clarification concerning con-
struction permit requirements in relation to the date that operating
permits
are
required.
During
the
R72-18
proceeding
in
1973
the
Board
established
September
1,
1974,
as
the
date
by
which
operating
permits
were
required for grain handling and conditioning operations
(8 PCB 307
and
9 PCB 47-49).
This date was extended beyond September
1,
1974,
pending review and final
action in the R72-l8, which is expected
soon.
Although dates for operating permits were dealt with in the
Interim Board Orders of 1973
(June
15 and August
9)
and August
8,
1974, construction permits were not mentioned specifically.
This
was an oversight.
Since R72-l8 regulations have not been promulgated,
standards
are not available to use in evaluating construction permit applica-
tions.
Therefore, the construction permit requirements under Rule
103(a) (1)
of Chapter
2, Air Pollution Regulations,
are hereby sus-
pended
as
they apply to grain handling and conditioning operations
which are the subject of the current R72—18 proceeding.
The date
on which construction permit requirements for such facilities will
be reinstated will be determined by subsequent Board action
in
the
current R72-18 proceeding,
as will operating permit requirements
according to our Interim Order of August 8,
1974.
Although construction permit requirements are temporarily
delayed
until
the R72-18 is finalized,
anyone who constructs
a
grain handling facility in the interim should first carefully review
and evaluate the proposed grain handling regulations to minimize the
possibility of unnecessary expense or effort.
IT
IS
THE
ORDER of the Illinois Pollution Control Board that
construction permit requirements under Rule 103(a) (1)
of Chapter 2,
Air Pollution Regulations,
are hereby suspended as they apply to
grain handling and conditioning operations which are the subject of
the current R72-18 proceeding, and that they will be determined by
subsequent Board action in the R72—18 proceeding.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control Board,
hereby certify that the above Opinion and Order was adopted on the
J)4F~
day of
~
,
1974, by a vote of
S
to
o
~thanL~~
14-233