ILLINOIS
    POLLUTION CONTROL BOARD
    May
    29,
    1975
    OLIN CORPORATION (JOLIET),
    Petitioner,
    v.
    )
    PCB 75—214
    ILLINOIS ENVIRONMENTAL PROTECTION
    AGENCY,
    Respondent.
    INTERIM ORDER OF THE BOARD
    (by Mr. Goodman):
    This matter comes before the Pollution Control Board
    (Board)
    upon Olin Corporation’s
    (Olin) May 22,
    1975, petition
    for a variance from Rules 204(c) (l)(A)
    and 203(g) (1) (A)
    and
    (C)
    of the Air Pollution Regulations.
    The Board finds Olin’s petition to be inadequate in
    that it fails to include information pertaining
    to the
    criteria required by Train
    v.
    NRDC,
    Inc.,
    43 USLW 4467
    (Supreme Court No. 73—1742, April 16,
    1975).
    Petitioner
    must show:
    1) Whether the ambient air quality of the area
    affected by the variance meets the national ambient air
    quality standards as adopted by the Board;
    2)
    If the ambient
    air quality does not meet those standards, whether the
    granting of the variance would contribute to the area’s
    failure to meet said standards;
    and
    3)
    If the ambient air
    quality does meet said standards,
    whether the variance would
    cause the ambient air quality to fail to meet said standards.
    It
    is
    the order of the Board that Petitioner shall
    amend its petition within 45 days of this Order to provide
    the above described information.
    Failure to timely file the
    amended petition shall cause the petition to be dismissed
    for inadequacy without prejudice.
    The 90-day decision
    period set by Statute shall run from the date of filing the
    amended petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify that the above Opinion and
    Order werp adopted on the
    ~
    day of
    /T)
    ,1975 by a
    vote of
    ~g—~
    Illinois Pollution
    rol Board
    17
    —217

    Back to top