CITY
OF
FAIRFIELD
)
)
)
v.
)
$ 71—336
ENVIRONMENTAL
PROTECTION
AGENCY
)
Opinion
and
Order of the
Board
(by
Mr.
Currie):
Fairfield
(1 71—366) operates an electric generating pflnt.
During
a
clutch
breakdown
the
city
~as forced to use boilets óñö of
which
did
not
meet
a4ssion
re4uiSfnents.
The
petition,
received
in
October,
1971,
recited
that
the
City
expected
to
be
able
to
discontinue
use
of
that
boiler
“as
soon
as
our
load
drops
and
this
should
be
within
a
week
or
two.”
It
is
evident
that
the
need
for
using
the
noncomplying
boiler
has long since passed according to
the petition itself,
and
thereforCthe”re
is
no
need
for us to pass
on the case.
Cf. National
Gypsum
Corp. v. EPA,
$ 71-99
(Aug.
2,
1971).
The petition is hereby dismissed as moot.
I,
Christan
Hoffett,
Clerk
of
the
Pollution
Control
Board
certify
that
the
Board
adopted
the
above
Opinion
and
Order
this
24th
day
of
January,
1972
by
vote
of
3-0.
~,.n
~.,/i;.
‘~‘
3—
sie