ILLINOIS POLLUTION
    CONTROL
    BOARD
    January
    24,
    1972
    CITY
    OF
    FAIRFIELD
    )
    )
    )
    v.
    )
    $ 71—336
    ENVIRONMENTAL
    PROTECTION
    AGENCY
    )
    Opinion
    and
    Order of the
    Board
    (by
    Mr.
    Currie):
    Fairfield
    (1 71—366) operates an electric generating pflnt.
    During
    a
    clutch
    breakdown
    the
    city
    ~as forced to use boilets óñö of
    which
    did
    not
    meet
    a4ssion
    re4uiSfnents.
    The
    petition,
    received
    in
    October,
    1971,
    recited
    that
    the
    City
    expected
    to
    be
    able
    to
    discontinue
    use
    of
    that
    boiler
    “as
    soon
    as
    our
    load
    drops
    and
    this
    should
    be
    within
    a
    week
    or
    two.”
    It
    is
    evident
    that
    the
    need
    for
    using
    the
    noncomplying
    boiler
    has long since passed according to
    the petition itself,
    and
    thereforCthe”re
    is
    no
    need
    for us to pass
    on the case.
    Cf. National
    Gypsum
    Corp. v. EPA,
    $ 71-99
    (Aug.
    2,
    1971).
    The petition is hereby dismissed as moot.
    I,
    Christan
    Hoffett,
    Clerk
    of
    the
    Pollution
    Control
    Board
    certify
    that
    the
    Board
    adopted
    the
    above
    Opinion
    and
    Order
    this
    24th
    day
    of
    January,
    1972
    by
    vote
    of
    3-0.
    ~,.n
    ~.,/i;.
    ‘~‘
    3—
    sie

    Back to top