ILLINOIS POLLUTION CONTROL BOARD
May 4, 2006
IN THE MATTER OF:
PETITION OF LAFARGE MIDWEST, INC.
FOR BOILER DETERMINATION
THROUGH ADJUSTED STANDARD
PROCEEDINGS PURSUANT TO
35 ILL. ADM. CODE 720.132 AND0.133
)
)
)
)
)
)
)
AS 06-3
(Adjusted Standard – Land)
ORDER OF THE BOARD (by A.S. Moore):
On March 29, 2006, petitioner Lafarge Midwest, Inc. (Lafarge) filed a petition (Pet.)
seeking a boiler determination under the criteria in the Board’s hazardous waste management
regulations through adjusted standard proceedings.
See
35 Ill. Adm. Code 720.132 (“Boiler
Determinations”). The petition concerns two raw mill dryers at Lafarge’s portland cement plant
located at 2500 Portland Road, Grand Chain, Massac County. Pet. at 2. Lafarge has waived its
right to a hearing on the petition. Pet. at 49;
see
35 Ill. Adm. Code 104.422(a)(1) (requiring
hearing when petitioner requests that one be held).
The Environmental Protection Act and the Board’s procedural rules require publication
of notice of a petition for an adjusted standard in a newspaper of general circulation in the area
likely to be affected by the petitioner’s activity. 415 ILCS 5/28.1 (2004); 35 Ill. Adm. Code
104.408(a). The notice must be published within 14 days of filing a petition for an adjusted
standard with the Board. 35 Ill. Adm. Code 104.408(a). Lafarge on April 27, 2006, timely filed
with the Board a certificate stating that
The Metropolis Planet
published notice of the petition on
April 12, 2006.
See
35 Ill. Adm. Code 104.410 (requiring filing of certificate within 30 days
after filing of petition).
Based on an initial review of Lafarge’s petition, the Board finds that it complies with the
petition content requirements contained in the Board’s procedural rules.
See
35 Ill. Adm. Code
104.406. Consequently, the Board accepts Lafarge’s petition for a boiler determination.
The Board’s procedural rules provide that, unless otherwise directed by the Board or
hearing officer, the Environmental Protection Agency (Agency) must file a recommendation
with the Board within 45 days after the filing of the petition. 35 Ill. Adm. Code 104.416(a).
Lafarge “may file a response to the recommendation within 14 days after the date of service of
the recommendation.” 35 Ill. Adm. Code 104.416(d).
IT IS SO ORDERED.
2
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on My 4, 2006, by a vote of 4-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board