    ORDER OF THE BOARD
    (by N. Nardulli):
    This matter comes before the Board on its own motion.
    This
    petition was filed with the Board on January 25,
    1991.
    No
    substantive action has taken place in this matter.
    The hearing
    officer is directed to schedule this matter for hearing by May
    11,
    1992, and to finish all hearings by July 15,
    1992.
    The
    hearing officer is also directed to set a post-hearing briefing
    schedule if required.
    Failure to complete hearings according to this schedule will
    subject this proceeding to dismissal for want of prosecution.
    IT IS SO ORDERED.
    I,
    Dorothy M.
    Gunn,
    Clerk of the Illinois Pollution Control
    Board,~hereby certify th~tth~above order was adopted on the
    ~-/~
    day of
    _______________,
    1992, by a vote of
    7~c
    .
    ,~
    /j~_~
    ~orothy
    N. G~nn,Clerk
    Illinois Po~1utionControl Board
    132—3 5

    Back to top