ILLINOIS POLLUTION CONTROL BOARD
    March 15,
    1973
    VILLAGE OF CATLIN
    v.
    )
    PCB73—i10
    ENVIRONMENTAL PROTECTION AGENCY
    INTERIM ORDER
    (by Mr.
    Dumelle):
    The petition
    filed with the Board on March
    12,
    1973 does
    not state
    the specific rule or regulation from which relief
    is sought.
    It
    is
    not clear whether the sewers themselves
    are
    overloaded or whether the sewage plant is inadequate.
    In
    addition, no facts are given as to the damage to the environ-
    ment that will result from the grant of this variance.
    The
    Board is also aware of a slowdown in the availability of
    Federal grant funds for sewage plant construction but the
    petition is not clear as
    La whether any Federal grant funds
    (as
    opposed to loan funds)
    are involved in the sewage plant
    construction.
    Petitioner is ordered
    to file an amended petition within
    15 days answering these points.
    If no additional information
    is received by the Board within this time then the petition is
    subject to dismissal as being inadequate.
    The 90 day period whict~the Board has in which to decide
    a variance shall run from the time of the submission of the
    amended petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, certify that the above Interim
    Order was adopted
    by the Board on the /~4~dayof
    ________________,
    1973,
    by
    a
    vote of
    (./
    to
    ~
    .
    /
    ,~./
    ~
    7
    327