This matter comes before the Pollution Control Board
(Board) upon a cor
Laint filed on January 21,
1976 by the
Environmental Prot~cizionAgency
(Agency) alleging that
Respondent owns and has operated a solid waste disposal
site
in the Northwest Quarter of the Southwest Quarter of
Section
3, Township 26-27 North, Range
8 East in Stephenson
County,
Illinois;
that on ten named dates from November
15,
1973 to September
16, 1975 Respondent failed to place final
cover
in compliance with Rule 305(c)
of the Chapter
7: Solid
Waste Regulations
(Regulations)
and Section 21(b)
of the
Environmental Protection Act
(Act); and that Respondent
ceased operating his solid waste disposal site in the fall
of 1973 and has failed to file a detailed description of the
site including a plat with the appropriate recording authority
in Stephenson County in violation of Rule 318(c)
of the Regu-
lations and Section
21(b)
of the Act.
On February
10, 1976
the Agency filed a Request for Admission of Fact.
This re-
quest went unanswered by Respondent.
Under
the Board’s
Procedural Rule 314 the matters of fact requested are admit-
ted
unless
a
response
is
made
within
twenty
days
of
service.
Under
t:h
i
s-;
Procedural
Rule Rusoonden~
is
LOUIId
L()
~1J VO
admitted the allegations of
the
complaint.
A hearing in this matter was held on June
8,
1976.
The
facts of the complaint were reaffirmed
in testimony by Respon-
dent
(R.
16, 17,
20,
21,
22).
The Board finds that Respondent
is
in violation of Rules
305(c)
of the Regulations and Section
21(b)
of the Act.
The
allegation of violation of Rule 318(c)
of the Regulations will be dismissed.
Rule 318(c) calls for
filing a plat upon closure of the site;
as the site was not
properly closed there could be no requirement to file the plat.
See EPA v. Gooder-Henrichson Company,
Inc.
26 PCB 355
(1976).
24—
219
—2—
Prior to determining what remedy
is appropriate in
this case the Board must consider the factors of Section
33(c)
of the Act.
The site is two miles east of Freeport
and
is one half
to one mile off the highway
(R.
34).
The
refuse
in the site consists of scrap, tires, refrigerators,
dryers,
and other items that are past use
(R.
17).
The area
containing the refuse was originally a sand and gravel pit
with
a depth of approximately forty feet
(R.
32).
This de-
pression has been in existence approximately forty years
(R.
32)
.
It does not flow into any stream and no water
gathers or stands on the site
(R.
32,
33).
The refuse was
deposited
in an attempt to fill in the void
(R.
33).
Filling in this area with refuse and not following proper
procedures can result in water pollution.
Water in the
form of precipitation running through the refuse will pro-
duce leachate,
The leachate will flow through the permeable
sand and gravel on which the refuse rests and on into the
ground water flow.
These materials have been on the property
approximately three years
(R.
37)
.
There was no evidence
presented actually showing contamination; however the poten-
tial for damage in a situation such as this
is great.
Respondent did shut down the site for acceptance of refuse
when the Agency sent notice on May 10, 1973 that a permit
was necessary to run a solid waste management site
(R.
17, 18).
Some cover, consisting of dirt and gravel from the site, was
applied in May 1974
CR.
19,
20).
This covered about thirty
percent of the site
(R.
20).
Respondent has contracted with
Ralph Helbin to cover the area
(R.
24).
Some fill has already
been brought in
CR.
24).
Mr. Helbin stated that if sand and
gravel would be satisfactory for a base with clay over the
top the job could
be
finished
earlier
CR.
24).
Mr.
Helbin
further stated that
fill
is difficult to get because most of
the buildings built in the area are on low ground and builders
have
to
bring
in
fill
CR.
25).
The
sources
for
fill
are
also
seasonal,
available
more
readily
April
through
October
CR.
25,
26).
Mr. Helbin estimated
if he could use sand and gravel
the job could be done
in about two weeks,
if other fill was
required it might extend to two years before fill would be
available
CR.
26,
27).
The site is a poor one for a waste management
site.
There
is
much
potential for leachate to flow into the ground
water and adequate cover material
is not readily available.
Using sand and gravel for cover will not prevent the leaching.
24
—
220
—3—
The
fact
that
Respondent
has
contracted
to
have
the
refuse covered shows that compliance
is economically and
practically reasonable.
The site in this case serves no
social or economic purpose and is a potential threat of
pollution.
Respondent has indicated a desire to bring the site
into compliance and to make the land usable
CR.
38).
Re-
spondent has been dilatory in providing cover; however, he
did cease dumping when he discovered he needed a permit.
Under these circumstances the Board finds that a penalty
of $300 is sufficient
to aid the enforcement of the Act.
Respondent shall also be required to bring the site in
question into compliance with the Regulations and the Act
within
60 days of this order.
This opinion constitutes the Board’s findings of fact
and conclusions of law.
ORDER
It is the
order
of the Pollution Control Board that:
1.
Respondent is found to be in violation of
Rule 305(c)
of the Solid Waste Regulations
and Section
21(b)
of the Act.
2.
The allegation of violation of Rule 318(c)
of the Solid Waste Regulations is dismissed.
3.
Respondent shall cease and desist any further
violations of the Regulations and/or the Act.
4.
Respondent shall bring the site in question
into compliance within 60 days of this order.
5.
Respondent
shall
pay
a
penalty
of
$300
for
the
aforementioned violations within
35 days of this
order.
Payment
shall
be
made
by
certified
check
or money order payable to:
State of Illinois
Environmental Protection Agency
Fiscal Services Division
2200 Churchill Road
Springfield, Illinois 62706
24
—
221
—4—
I,
Christan
L.
Moffett,
Clerk
of
the
IllinoIs
Pollution
Control
Board,
hereby
certify
the
above
Opinion
and
Order
were
adopted
on
the
/~‘~
day
of
~
,
1976
by
a
vote
of
..~-C
Q4~anL.Mofth~~
Illinois
Pollution
Co
trol
Board
24
—
223