ILLINOIS POLLUTION CONTROL BOARD
September
6,
1972
CRANE
PACKING COMPANY
(MORTON GROVE PLANT)
V.
)
PCB 72—131
ENVIRONMENTAL PROTECTION AGENCY
CRANE PACKING COMPANY
(CRYSTAL LAKE PLANT)
v.
)
PCB 72—132
ENVIRONMENTAL PROTECTION AGENCY
OPINION AND ORDER OF THE BOARD
(by Mr. Parker):
This Order supplements earlier Orders dated April
4,
1972 and May 17,
1972.
These are related variance proceed-
ings brought upon petitions filed March 31,
1972.
Petitioner
sought variances for its Morton Grove and Crystal Lake plants
from certain of the asbestos emission regulations until
October 31, 1972.
Public hearings were scheduled
(by Board Order dated
April
4,
1972) but cancelled after receipt of
the Agency
Recommendations and a letter from petitioner’s attorneys
dated May
15,
1972 indicating that the Agency recommendations
were acceptable to petitioner.
The Agency recommended
that
the variances be granted subject to certain conditions.
By Order dated May 17, 1972 we granted both variances
subject to conditions specified in several numbered para-
graphs of
the Order.
One condition
(par.
3) was that peti-
tioner report within
45 days on the economic feasibility of
performing
a stack test on emissions from the fabric dust
collector after installation.
We reserved the right, based
upon this report,
to order sudh tests to be performed as
might be necessary.
Petitioner has now notified the Board
(by letter dated
July
5,
1972)
that a stack
test will cost $700 to $1,200
and that petitioner
“does not feel that the expense of
running stack sampling as
a
‘proof of performance’ may be
necessary for compliance with the regulations.”
The Agency
in its reply
(letter dated August 11,
1972)
concedes that
5
—
359
emissions sampling is not absolutely necessary for proof
of compliance with the standards but argues that the $700
-
$1,200 cost of the stack
test is “neither excessive nor
abnormal”.
We have no record beyond these two letters
to look to
for evidence as
to the need for and economic feasibility
of stack testing in this situation.
We find,
however,
that
petitioner has failed to advance persuasive reasons why the
$700
—
$1,200 expenditure for stack testing would not be
reasonable under
the
circumstances here.
This Board has
often emphasized that stack tests give the best indication
of the actual performance of control equipment
(e.g.
see
In re: Emission Standards,
PCB *R7l—23, dated April
13,
1972,
page 9).
We accordingly order that petitioner conduct one or
more stack tests on emissions from the fabric dust collector
after
installation, and report the test results
to the Agency
and to this Board.
The Agency
is then ordered
to advise the
Board whether,
and
the extent to which,
the test results
affect the continuing grant of these variances.
I,
Christan
L. Moffett, Clerk of
the Illinois Pollution Control
Board,
hereby certify the above Opinion and Order was adopted
on
the
c”
day of\&~j~~L/~~
,
1972 by
a vote of
-~‘
to
~
.
.1
~
/fl~~ ~
Christan LJ~Øett
5
—