ILLINOIS POLLUTION CONTROL BOARD
    October 21,
    1993
    PERMA-TREAT OF ILLINOIS,
    )
    Petitioner,
    v.
    )
    PCB 93—159
    )
    (Permit Appeal)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD
    (by G.
    T. Girard):
    This matter comes before the Board on a October 12,
    1993,
    motion to file the record instanter filed by the Illinois
    Environmental Protection Agency (Agency).
    This petition was
    filed with the Board on August 27,
    1993,
    and the Agency asserts
    that it received notice of the petition on August 30,
    1993.
    Pursuant to 35 Ill.
    Adin. Code 105.102(a) (4), the Agency record
    is
    to be filed with the Pollution Control Board within 14 days “upon
    notice of the petition”.
    The record was therefore due to be
    filed on September 13,
    1993.
    This motion and the record were
    filed 42 days after the Agency received notice of petitioner’s
    appeal, and are 28 days late.
    The Board
    is concerned about the significant delay in filing
    this record.
    The Board also notes with concern the absence of
    any earlier motion requesting an extension of time.
    The Agency’s
    motion to allow filing of the Agency record instanter is hereby
    granted.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certify that the above order was adopted on the
    (~,-~v’
    day of
    _____________________,
    1993, by a vote of
    7
    C
    ~
    Dorothy N. 4~inn,Clerk
    Illinois P~?.11utionControl Board

    Back to top