    IN THE MATTER
    OF
    JOINT PETITiON CF THE VILLAGE
    )
    PCB 85—33
    OF
    HARTFORD AND THE ILLINOIS
    ENVIRONMENTAL PRO~IECTIONAGENCY
    FOR EXCEPTION TO THE COMBINED
    SEV~ER OVERFLOW
    ;~CULATIONS
    INTERIM
    ORDEi~
    THE
    BOARD (by B.
    Forcade):
    On March
    l98E~the Village of Hartford (“Village”)
    and
    the Illinois
    ronmental Protection Agency (“Agency”)
    filed
    for
    an exception
    ~
    il..
    Adm.
    Code 306.305
    (a)
    and
    (b)
    of
    the
    Board’s combint~ee~eroverflow regulations.
    By Order of March
    22,
    1985,
    the E~d
    ncfted
    a deficiency
    in the petition, per-
    taining
    to information required by 35
    Ill. Mm.
    Code 306.363(d)
    relating
    to va~:lancesor enforcement status
    and requested this
    matter
    be addressed at hearing.
    In reviewing the presently
    existing record,
    the Board has been unable to find this
    information.
    Consequently, the Board will again request
    information on prior variances and enforcement status relating to
    the Village of Hartford,
    Additionally, the Board will request
    information on five other matters,
    The ViLLage
    of Hartford
    or the Illinois Environmental
    Protection Agency is ordered
    to provide the Board, within 60 days
    of
    the date
    of
    ~
    Crdei:,
    with the following information:
    1.
    A st:~~:~.as required by 35
    Ill. Adm. Code
    306
    ~isto whether
    the Village has previously
    been
    ~t~•d
    any
    variances or been subject
    to any
    enfo~~mer~i:
    ~t~tion.
    2.
    A
    statecunt
    on
    the
    present
    status
    of
    the
    ccood
    River
    Regional
    ~a~tewater
    Treatment
    project,
    including
    any
    anticipa~cI
    schedule
    for
    the Village
    of
    the Hartford
    to
    hook~u~~o ~tet
    project.
    3.
    A statement of clarification as to what percentage of
    the
    f.Li~-st flush of
    a one—year,
    one—hour
    storm would
    be
    captured
    :~
    the pumping
    system proposed
    by the Village
    of Hartford and the Agency
    in their draft order.
    4.
    A
    discussion
    of the present compliance status of
    the
    facili~:y:~e~.
    does the facility qualify
    for the
    exempt~on
    of
    35
    Iii. Adm~Code 304.301?
    85-485

    5.
    A clearer statement
    of
    the
    relief requested.
    Is the
    relief prospective only,
    i.e.,
    after
    the ~ood River
    Regional Treatment Project
    is operational, or
    is
    it
    presently needed?
    6.
    A statement that
    the
    time limitations of
    35
    Ill. Adm.
    Code
    306. 351 have been met?
    IT
    IS
    SO ORDERED
    I, Dorothy M~Gunn,
    Cleri~ of
    the Illinois Pollution Control
    Board, hereby certify
    tImt~,tue above Interim Order was adopted on
    the
    ~
    day of ________________________,
    1985,
    by a vote
    of
    7—&
    .
    4-
    -,
    1’’
    ~
    /12,
    ~
    Dorothy
    M, ~unn, Clerk
    Illinois Pollution Control Board

    Back to top