ILLINOIS POLLUTION CONTROL BOARD
February
6,
1986
IN THE MATTER OF:
)
JOINT PETITION OF THE METROPOLITAN
)
SANITARY DISTRICT OF GREATER CHICAGO
)
PCB 85-202
AND THE ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY FOR EXCEPTION
)
TO THE COMBINED SEWER OVERFLOW
)
REGULATIONS
)
ORDER OF THE BOARD
(by J.D.
Dumelle):
This matter comes before
the Board upon a December 16,
1985,
Joint Petition for Exception
to the Combined Sewer Overflow
regulations filed
by the Metropolitan Sanitary District of
Greater Chicago and the Illinois Environmental Protection Agency.
The Board has limited
funds
in this fiscal year
in which to
pay for transcripts
in the hearing or hearings required
in this
proceeding.
The Board
is contemplating a delayed scheduling
of
the hearing or hearings until after July 1,
1986
in order
to
utilize
funds from the new FY87 appropriation.
If this delay
raises a problem
the parties are requested
to respond
and
delineate
the nature of the problem within 30 days of the date of
this Order.
IT
IS
SO ORDERED.
I, Dorothy
M. Gunn,
Clerk of the Illinois Pollution Control
Board,
her,.eby certify that~be above Order was adopted
on
the
_______________
day of
_____________,
1986
by a vote
of
1-c
.
Dorothy M.
G
nfl, Clerk
Illinois Pollution Control Board