ILLINOIS POLLUTION CONTROL BOARD
July
1.,
1991
DEPARTMENT
OF
THE
ARMY,
)
)
Petitioner,
)
v.
)
PCB 91—113
)
(Variance)
ILLINOIS
ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by B.
Forcade):
On July 8,
1991,
the Department of the Army filed a petition
for variance from a Board Order in PCB 87-38,
for its bankline
disposal of dredged material from the Illinois River.
That
petition is deficient in that it fails to provide:
1.
The quantity and types of materials discharged from the
process or activity requiring the variance; the
location of the points of discharge,
and, as
applicable, the identification of the receiving
waterway or land,
or the location of the nearest air
monitoring station maintained by the Agency, as
required by 35 Ill. Adm. Code 104.121(d);
Specifically, the Petition lists 19 references that contain
actual analytical data on contaminant concentrations,
but fails
to include a copy of any such documents.
The Board directs that
the Army either file one copy of each of those reference
documents with the Clerk of the Board or file a motion stating
why such filing would be unreasonable.
Additionally,
in paragraph 6 of the Petition, the Army
requests that the Board incorporate the entire record of three
prior proceedings.
That request is denied.
The.Board will
incorporate by reference all prior Board Opinions and Orders.
Petitioner may “upon separate written request” incorporate
portions of the prior record by filing four copies with the
Clerk,
consistent with the procedural rules at 35
Ill. Adm. Code
101.106.
IT IS SO ORDERED.
124—9
7
2
I, Dorothy M.
Gunn, Clerk of the Illinois Pollution Control
Board, hereby certify that the abov
Opinion and Order was
adopted on the
/
/
~
day of
___________________,
1991, by a
vote of
7—c
.
~
~.
Dorothy H. ,~nn,ëlerk
Illinois P4llution Control Board
124—98