This matter comes before the Board on receipt of an Agency
Recommendation dated August
8,
1990.
The recommendation refers
to a request from Petitioner, Electric Energy,
Inc.,
for a
provisional variance from the suspended solids
(TSS)
effluent
requirements, as set forth in 35 Ill.
Adin.
Code 304.120 and
304.141(a),
for the period from when the Petitioner commences
construction at its wastewater treatment facilities,
and
continuing until the Petitioner completes that construction, but
not for longer than 45 days.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions.
The Agency
agrees that the repairs are necessary.
The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream.
The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact.
The Agency
maintains that a grant of a provisional variance would violate no
federal laws.
The Agency opines that a denial of the requested
provisional variance would create an arbitrary and unreasonable
hardship on the Petitioner.
In light of the Agency Recommendation, the Board hereby
grants a provisional variance from 35
Ill. Adm. Code 304.120 and
304.141(a)
on the following conditions:
1.
The term of this provisional variance shall commence
the Petitioner,
Electric Energy,
Inc.
initiates
construction, and it shall expire on the date the Petitioner
completes construction or after 45 days have elapsed,
whichever comes first;
2.
The Petitioner shall notify Dwight Hill of the Agency’s
Marion Regional office by telephone,
at 618/997—4371 when it
initiates construction and when it completes construction,
and the Petitioner shall confirm this notice
in writing
within five days,
addressed as follows:
114— iii
2
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois
62794—9276
Attention:
Barbara Conner
3.
The Petitioner shall complete construction as soon as
possible and operate
its plant during the term of this
provisional variance
in
a manner that assures the best
treatment practicable; and
4.
The Petitioner shall execute
a copy of a Certificate of
Acceptance of this provisional variance and forward that
copy to the Agency addressed as is required above for a
notice; the Petitioner shall forward that copy within
10
days of the date of this Order of the Board,
and the
Certificate of Acceptance shall take the following
form:
CERTIFICATION
I
(We), __________________________________-
hereby accept and agree to he bound by all terms
and conditions
of the Order of the Pollution
Control Board
in PCB
90—155,
August
9,
1990.
Petitioner
Authorized Agent
Title
Date
IT
IS SO ORDERED.
ii ,‘~—1I
3
I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
Bo~rd, do hereby,~ertifythat the above Order was adopted on the
‘~7”~ day of
4~e
(-‘SP
,
1990,
by
a vote of
/-~47~
~
D~rothyN. ~Inn,
Clerk
Illinois Pollution Control Board
114-413