    ORDER OF THE
    BOARD
    (J.
    Marlin):
    This matter comes before the Board on receipt of an Agency
    Recommendation dated August
    8,
    1990.
    The recommendation refers
    to a request from Petitioner, Electric Energy,
    Inc.,
    for a
    provisional variance from the suspended solids
    (TSS)
    effluent
    requirements, as set forth in 35 Ill.
    Adin.
    Code 304.120 and
    304.141(a),
    for the period from when the Petitioner commences
    construction at its wastewater treatment facilities,
    and
    continuing until the Petitioner completes that construction, but
    not for longer than 45 days.
    The Agency recommends that the Board grant the requested
    provisional variance with specified conditions.
    The Agency
    agrees that the repairs are necessary.
    The Agency anticipates
    that the requested provisional variance would have minimal
    environmental impact on the receiving stream.
    The Agency is
    unaware of any public water supplies that the requested
    provisional variance would adversely impact.
    The Agency
    maintains that a grant of a provisional variance would violate no
    federal laws.
    The Agency opines that a denial of the requested
    provisional variance would create an arbitrary and unreasonable
    hardship on the Petitioner.
    In light of the Agency Recommendation, the Board hereby
    grants a provisional variance from 35
    Ill. Adm. Code 304.120 and
    304.141(a)
    on the following conditions:
    1.
    The term of this provisional variance shall commence
    the Petitioner,
    Electric Energy,
    Inc.
    initiates
    construction, and it shall expire on the date the Petitioner
    completes construction or after 45 days have elapsed,
    whichever comes first;
    2.
    The Petitioner shall notify Dwight Hill of the Agency’s
    Marion Regional office by telephone,
    at 618/997—4371 when it
    initiates construction and when it completes construction,
    and the Petitioner shall confirm this notice
    in writing
    within five days,
    addressed as follows:
    114— iii

    2
    Illinois Environmental Protection Agency
    Division of Water Pollution Control
    Compliance Assurance Section
    2200 Churchill Road
    P.O. Box 19276
    Springfield, Illinois
    62794—9276
    Attention:
    Barbara Conner
    3.
    The Petitioner shall complete construction as soon as
    possible and operate
    its plant during the term of this
    provisional variance
    in
    a manner that assures the best
    treatment practicable; and
    4.
    The Petitioner shall execute
    a copy of a Certificate of
    Acceptance of this provisional variance and forward that
    copy to the Agency addressed as is required above for a
    notice; the Petitioner shall forward that copy within
    10
    days of the date of this Order of the Board,
    and the
    Certificate of Acceptance shall take the following
    form:
    CERTIFICATION
    I
    (We), __________________________________-
    hereby accept and agree to he bound by all terms
    and conditions
    of the Order of the Pollution
    Control Board
    in PCB
    90—155,
    August
    9,
    1990.
    Petitioner
    Authorized Agent
    Title
    Date
    IT
    IS SO ORDERED.
    ii ,‘~—1I

    3
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Bo~rd, do hereby,~ertifythat the above Order was adopted on the
    ‘~7”~ day of
    4~e
    (-‘SP
    ,
    1990,
    by
    a vote of
    /-~47~
    ~
    D~rothyN. ~Inn,
    Clerk
    Illinois Pollution Control Board
    114-413

    Back to top